Which materials are on the critical path — and are they on track?

Lead times, procurement status, delivery schedules — visible, not buried in emails. Track materials, DfMA components and product data in one connected platform.

Teams using Morta achieve:

Material traceability
Approval efficiency
Quality assurance
Sustainability compliance
Logistics coordination
Material & Logistics Control
Standardised material governance from specification through procurement to site delivery
Structural
MEP
Finishes
External
Morta Templates & Resources
Material & DfMA Tracking
Material Approval / Submittal
Material Testing Schedule
Quality Inspection & Test Plan
Embodied Carbon Tracker
Change Impact Assessment
Waste Management Plan
Connected Systems

Everything you need to manage materials and logistics.

From material approvals to testing schedules, Morta connects your material data to your quality and procurement controls.

Connect to your existing systems.

Manage material approval workflows from submission through review to approval. Track product data sheets, certificates and test results against specification requirements.

Submittal approval workflows

Linked to design specifications

Connect to your existing systems.

Collaborate across teams.

Track design for manufacture and assembly (DfMA) components from design through fabrication to installation. Monitor off-site manufacturing progress and delivery schedules.

Off-site manufacturing tracking

Component-level traceability

Collaborate across teams.

Configure to meet your workflows.

Track sustainable timber certifications, material testing schedules and environmental compliance. Ensure all materials meet specification and regulatory requirements with structured evidence collection.

FSC/PEFC certification tracking

Construction Products Regulations compliance

Configure to meet your workflows.

Frequently asked questions.

Common questions about this template and how it works.

How does Morta manage material approvals?

Morta provides structured material approval workflows where submittals progress through submission, review and approval stages. Each submittal links to product data sheets, test certificates and specification requirements, giving reviewers all the information they need in one place.

How do you track DfMA components?

Morta tracks DfMA components from design through fabrication to installation. You can monitor off-site manufacturing progress, delivery schedules and installation status for each component, with full traceability back to design specifications and quality records.

How does material testing tracking work?

Material testing schedules in Morta define required tests for each material type, track sample collection and submission, and record test results against acceptance criteria. Failed tests trigger alerts and link to non-conformance records for structured resolution.

How does Morta support sustainable procurement?

Morta tracks sustainable timber certifications (FSC/PEFC), environmental product declarations and other sustainability evidence. You can verify that all materials meet your sustainability requirements and regulatory obligations with a complete audit trail.

How does Morta support golden thread compliance?

Morta provides full material traceability from specification through procurement, approval, testing and installation. This creates the golden thread of information required by the Building Safety Act, ensuring you can demonstrate compliance for every material used in the building.

Can Morta import from Excel?

Yes. You can import data directly from Excel spreadsheets into Morta. This makes it easy to migrate existing trackers, registers, and datasets without manual re-entry.

Can Morta export to Word and Excel?

Yes. Morta supports exports to both Excel and Word formats. Exports can be configured to match your company brand styling, so reports and deliverables are ready to share without additional formatting.

A £50m project can be delayed by a £500 component if nobody's tracking it.

Trusted by industry leaders across the supply chain.

Commercial Construction
One of our most successful implementations has been using Morta to track agency labour. We’ve got about 20-odd people inputting into this project. It’s just running in the background. Everyone’s getting on with it, and it works beautifully.
InformationScheduleWorkforce
Defence & Naval
With Morta and IFC Open Shell, we’re saving 114 hours of manual effort per validation cycle.
InformationDesignRequirements & Quality
Information Management Consultancy
This is still a work in progress. Our goal is full automation where design teams can validate independently.
DesignRequirements & Quality
I now get requests from colleagues who are Lead TAs or architects saying: I have an idea for Morta. Can we do this? Can we test that? It’s really nice to see people understanding the value. This is not an IM thing. This is not a BIM thing. This is something that will benefit the whole project.
InformationDesign
Commercial Construction
It’s no longer subjective — it’s the truth as to where we are. Morta has helped us with our checking and reporting, pulling together dashboards and giving us proper optics on what we’re doing.
Information
Public Sector
We’re using Morta not to replace existing systems but to connect them. It creates an integrated Information Management Platform enabling a data-centric approach, KPI tracking, automation, a golden thread of data, and audit trails.
InformationRequirements & Quality

Ready to connect your controls?

Get in touch with our team to see how Morta can drive delivery performance across your projects.