Operational readiness and asset management.

Track maintenance schedules, energy performance and post-occupancy evaluation against the as-built model. Connected to CAFM (Planon, Maximo) and asset management systems.

Teams using Morta achieve:

Maintenance compliance
Energy efficiency
Asset performance
Occupant satisfaction
Lifecycle value
Operational Management Control
Standardised operational governance from handover through ongoing facility management
Mechanical
Electrical
Fabric
Grounds
Morta Templates & Resources
Maintenance Schedules
ESG Tracking and Reporting
Asset Register
Post-Occupancy Evaluation
Soft Landings Plans
Warranty Tracker
Plant & Equipment Register
Connected Systems

Frequently asked questions.

Common questions about this template and how it works.

How does Morta support maintenance scheduling?

Morta connects asset data from handover to structured maintenance schedules. You can track planned preventive maintenance against SFG20 benchmarks, monitor compliance with statutory obligations and link maintenance activities to asset registers and warranty information.

How is energy performance tracked?

Morta allows you to track energy performance against original design targets. You can monitor display energy certificates, metering data and carbon emissions over time, identifying where actual performance diverges from design intent to drive efficiency improvements.

How does post-occupancy evaluation work in Morta?

Post-occupancy evaluation is managed through structured trackers that capture occupant feedback, building performance data and lessons learnt. Results can be compared against design targets and benchmarks to identify improvements for both the current building and future projects.

How does handover data connect to operational management?

Asset data, O&M manuals, warranties and maintenance requirements captured during handover flow directly into operational trackers. This eliminates the need to re-enter data and ensures your FM team has complete, structured information from day one of operation.

How does Morta support Government Soft Landings?

Morta supports Government Soft Landings by tracking aftercare activities, post-occupancy evaluation criteria and transition planning throughout the project lifecycle. Soft landings plans created during design and construction are linked to operational trackers to ensure continuity from project delivery to building operation.

Can Morta import from Excel?

Yes. You can import data directly from Excel spreadsheets into Morta. This makes it easy to migrate existing trackers, registers, and datasets without manual re-entry.

Can Morta export to Word and Excel?

Yes. Morta supports exports to both Excel and Word formats. Exports can be configured to match your company brand styling, so reports and deliverables are ready to share without additional formatting.

Trusted by industry leaders across the supply chain.

Commercial Construction
It’s no longer subjective , it’s the truth as to where we are. Morta has helped us with our checking and reporting, pulling together dashboards and giving us proper optics on what we’re doing.
Information
Design Consultancy
When you put together the numbers , how much individual people cost, how many days we expect them on a project , this gives you a very easy to understand fee burn-down schedule with real forecasting rather than just guessing.
ScheduleWorkforce
MEP
I asked our document control guys how much time Morta saved them, and what they said was two days a week. That means 256 hours a month saved, and it’s just from four document controllers.
InformationDesign
Commercial Construction
One of our most successful implementations has been using Morta to track agency labour. We’ve got about 20-odd people inputting into this project. It’s just running in the background. Everyone’s getting on with it, and it works beautifully.
InformationScheduleWorkforce
Defence & Naval
With Morta and IFC Open Shell, we’re saving 114 hours of manual effort per validation cycle.
InformationDesignRequirements & Quality
Information Management Consultancy
Before Morta, we needed to export everything to CSV files and manually upload it for validation. Now, we can do it with a simple click.
DesignRequirements & Quality

Get started

Try Morta on a real project.