Consultant

Arup Mott MacDonald JV

Arup Mott MacDonald JV brings the two design consultancies together for Lower Thames Crossing's Tunnels and Approaches package. The team's work with Morta connects information delivery planning to the requirements behind design components, developed jointly with the contractor.

A shared foundation for design information

The design joint venture is identified in the project's contract data dated January 2024. During the preliminary phase, the designer and contractor teams developed their Morta setup together, agreeing common conventions while retaining their separate CDEs. At the community session, they described working delivery plans and a component catalogue, with direct P6 connections among the next developments.

Introduction slide naming Thibaud Guerrero, Project Digital Lead for BMJV, and Ioan Evans, Design BIM Lead for AMJV.
Thibaud Guerrero and Ioan Evans introduced the contractor and designer perspectives on Lower Thames Crossing.

The team

The designer's contribution combined information requirements, design delivery and the practical experience of people using the system.

Ioan Evans was introduced as Design BIM Lead for AMJV and identified himself as working for Arup. He explained the delivery-plan structure, cross-CDE creation process and component catalogue, including how shared information drove design-software configuration.

Ioan Evans wearing glasses and a headset, with his webcast name label visible.
Ioan Evans speaking during the community session; webcast crop, not an official portrait.

Case studies

Collaborative information delivery on Lower Thames Crossing

Ioan Evans and Thibaud Guerrero describe the choices behind a shared approach to project information. Follow how the design and contractor teams established their foundations, made them usable across organisational boundaries and decided how to extend them without losing common standards or local ownership.

Read the Lower Thames Crossing story.